Customer:
TDI INDRATRUCTURE LTD
Project Category:
STP
Customer Requirement:
TDI Infra, Agra required a 150 KLD prefabricated and containerised STP solution with a compact, modern and aesthetically impressive design. The client specifically required MS-FRP fabricated tanks, efficient process integration, high-quality fabrication and a neat overall finish. The objective was to develop an STP that delivers reliable treatment performance while also offering a professional look, compact footprint and easy installation & maintenance. The final plant design and execution were highly appreciated by the TDI Infra team.
Project Result:
COMPLETE
What we did:
Ventilair Engineers designed, fabricated and installed a 150 KLD prefabricated containerised STP for TDI Infra, Agra. We developed the complete treatment system with MS-FRP tanks, integrated process equipment, piping, electrical and mechanical components in a compact and well-organised layout. Special attention was given to process efficiency, fabrication quality, accessibility, finishing and overall aesthetics, resulting in a modern STP that is both technically efficient and visually impressive.
Project Description
150 KLD Prefabricated Containerised STP Plant for TDI Infra, Agra A New Milestone in Prefabricated STP Solutions by Ventilair Engineers Ventilair Engineers is proud to announce the successful design, manufacturing and installation of a 150 KLD Prefabricated Containerised Sewage Treatment Plant (STP) for TDI Infra, Agra. This project is a significant achievement for us—not only because of its treatment capacity, but because of its compact prefabricated design, technical execution, quality, finishing and overall appearance. Unlike conventional STPs, where treatment tanks are generally constructed in RCC/civil structures, this project has been developed with MS-FRP fabricated tanks, making the complete system highly suitable for a prefabricated and containerised installation approach. Key Project Highlights Capacity: 150 KLD Client: TDI Infra Location: Agra, Uttar Pradesh Type: Prefabricated / Containerised STP Tank Construction: MS-FRP Design: Compact, integrated and space-efficient Process: Advanced biological sewage treatment process Scope: Design, fabrication, supply and installation by Ventilair Engineers Designed for Performance & Presentation The objective was not simply to build an STP, but to develop a system that combines engineering performance with an impressive industrial appearance. The complete plant has been carefully designed with attention to: Efficient treatment process Proper equipment integration Easy operation and maintenance Compact space utilisation Neat piping and equipment arrangement Structural strength and durability Professional finishing and aesthetics The design, quality, process arrangement and overall look of the plant have been highly appreciated by the TDI Infra team, making this project a proud showcase for Ventilair Engineers. A New Achievement in Prefabricated STPs Ventilair Engineers has already successfully executed large-capacity STP projects, including 500 KLD + 500 KLD and other high-capacity installations. However, those projects are primarily based on civil/RCC treatment structures and plant-room configurations. The 150 KLD TDI Infra project represents a different engineering approach—a fully prefabricated and containerised STP solution with MS-FRP tanks. For Ventilair Engineers, this makes the project an important milestone in our journey towards developing modern, modular and aesthetically designed wastewater treatment solutions. From Conventional Civil Plants to Modern Modular STPs With this project, Ventilair Engineers demonstrates its capability to deliver STPs not only in conventional civil-based configurations, but also in prefabricated, modular and containerised formats. The project reflects our focus on combining: Engineering + Process Efficiency + Fabrication Quality + Compact Design + Aesthetic Finish We sincerely thank TDI Infra for giving Ventilair Engineers the opportunity to execute this project and for appreciating the quality, design and overall execution of the plant. This 150 KLD Prefabricated Containerised STP is more than just another installation for us—it is a showcase of our engineering capabilities and an important milestone in our prefabricated wastewater treatment solutions.
Project Budget:
55,000,00
Completion Date:
2026-09-11T00:00:00